Availability: | |
---|---|
Quantity: | |
Product Name: | Candlewood Suites by IHG |
Base Material: | MDF / Plywood / Particleboard |
Headboard: | With Upholstery / No Upholstery |
Casegoods: | HPL / LPL / Veneer Painting |
Countertop Selection: | HPL / Quartz / Marble / Granite / Cluture Marble |
Softseating Fabrics: | Customized / Similar Fabrics Substitute |
Specifications: | Customized |
Application: | Hotel Guestroom / Bathroom / Public |
Delivery Time: | 45-50 Days |
Payment Terms: | By T/T, 50% Deposit And The Balance Before Shipping |
Delievery Way: | FOB / CIF / DDP |
King Headboard
Queen Headboard
Headboard Bottom Panel At Renovation
Nightstand
Coat hooks
Console Table
C-Table
Nesting Tables
TV Stand and Desk
Desk and Dresser Unit at ADA Bedroom
Dresser at One Bedroom Units
Dresser at Renovation Projects
Desk for Renovation Projects
Desk for Studio Units
Mudroom for One Bedroom Units
Magazine Rack For Renovation
1. Consultation: The first step is often a consultation with a sales representative or project manager to discuss the hotel's needs, budget, and design preferences.
2. Design: The next step often involves creating detailed designs and mock-ups for the client's review and approval. This may include CAD drawings, 3D renderings, and material samples.
3. Manufacturing: Once the designs are approved, production can begin. The manufacturing process may take several weeks or even months, depending on the scope of the project.
4. Quality control: Throughout the manufacturing process, quality control procedures are in place to ensure that each piece meets the company's high standards.
5. Delivery and Installation: Once manufacturing is complete, the furniture is carefully packaged and shipped to the hotel. In many cases, the company will also provide installation services, ensuring that each piece is properly installed and assembled.
6. After-sales support: Finally, many hotel furniture companies offer after-sales support, including maintenance services, repairs, and warranty coverage.
Product Name: | Candlewood Suites by IHG |
Base Material: | MDF / Plywood / Particleboard |
Headboard: | With Upholstery / No Upholstery |
Casegoods: | HPL / LPL / Veneer Painting |
Countertop Selection: | HPL / Quartz / Marble / Granite / Cluture Marble |
Softseating Fabrics: | Customized / Similar Fabrics Substitute |
Specifications: | Customized |
Application: | Hotel Guestroom / Bathroom / Public |
Delivery Time: | 45-50 Days |
Payment Terms: | By T/T, 50% Deposit And The Balance Before Shipping |
Delievery Way: | FOB / CIF / DDP |
King Headboard
Queen Headboard
Headboard Bottom Panel At Renovation
Nightstand
Coat hooks
Console Table
C-Table
Nesting Tables
TV Stand and Desk
Desk and Dresser Unit at ADA Bedroom
Dresser at One Bedroom Units
Dresser at Renovation Projects
Desk for Renovation Projects
Desk for Studio Units
Mudroom for One Bedroom Units
Magazine Rack For Renovation
1. Consultation: The first step is often a consultation with a sales representative or project manager to discuss the hotel's needs, budget, and design preferences.
2. Design: The next step often involves creating detailed designs and mock-ups for the client's review and approval. This may include CAD drawings, 3D renderings, and material samples.
3. Manufacturing: Once the designs are approved, production can begin. The manufacturing process may take several weeks or even months, depending on the scope of the project.
4. Quality control: Throughout the manufacturing process, quality control procedures are in place to ensure that each piece meets the company's high standards.
5. Delivery and Installation: Once manufacturing is complete, the furniture is carefully packaged and shipped to the hotel. In many cases, the company will also provide installation services, ensuring that each piece is properly installed and assembled.
6. After-sales support: Finally, many hotel furniture companies offer after-sales support, including maintenance services, repairs, and warranty coverage.